Here is your assignment: You work for a Landscape architect. They have asked you to be a part of their team as they need a computer programmer, analyst, and designer to aid them in calculating engineering specification. Specifically, you have been assigned to the Pools, Hot Tubs, and Spas section of their landscaping team. Your skills will be needed in creating a GUI program that calculates engineering specifications.The importance of a graphical user interface in programming is paramount in being successful in the business industry. This project incorporates GUI techniques with other tools that you have learned about in this class.
This assignment is due in Week 7, but it is suggested that you begin working on the project in Week 5, which should give you ample time to complete the project. You will find that all the lectures, Quick Test Programs, and Lab assignments will prepare you for the Course Project.
Request for New ApplicationIn Week 4, you will complete the analysis and design for the project. You will use the information described in the required reading to create the Analysis and Design documentation. You will create the following items.
The Analysis and Design document will be a single MS Word document, which contains all descriptions and drawings. See the grading rubric below for the Analysis and Design document, due in Week 4.
Item |
Points |
Description |
Request for New Application |
2.5 |
A table containing: date of the request, name of the requester, the purpose of the request, the title of the application, brief description of the algorithms used in the application, notes about the request, and finally, the approval section. |
Problem Analysis |
2.5 |
Analyze the problem to be solved and write in a few words what is the problem and what is being proposed to solve the problem. |
List and Description of Requirements |
5 |
A description of the items that will be implemented in order to construct the proposed solution. |
Interface Storyboard / Drawing |
5 |
A picture or drawing of what the application will look like; must include the image of each section of the application in detail. |
Design Flowchart or Pseudocode |
5 |
A sketch of the flow of the application or the pseudocode of the application. |
Subtotal |
20 |
In Week 7 you will be required to submit a User Manual as well as your Java code. The User Manual can be a simple Word document, with screenshots, that explains how to run your application. Your mark will depend both on the program quality, and the quality of the User’s Manual.Your actual Course Project and User’s Manual are due at the end of Week 7, however, it is strongly recommended that you start your project in Week 5 to avoid many last minute issues.
Here are some more detailed guidelines about the User’s Manual
Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.
You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.
Read moreEach paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.
Read moreThanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.
Read moreYour email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.
Read moreBy sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.
Read more